Annual repair and maintenance of 3 X 10 TR packaged water cooled AC Plant Units at studio AIR Bikaner |
All India Radio |
Engineering |
Bik 1(2)1/2018-19/METP/E/47 to 56 |
|
|
|
|
|
|
|
|
|
|
|
Providing and laying Granite flooring at entrance of office block of All India Radio, Delanipur, Port Blair. |
All India Radio |
Engineering |
1 (21) E/2018-19 |
|
Revised Draft SPECIFICATIONS for SETC of 100 W Digital Compatible VHF FM Solid State MOSFET Technology Based Broadcast Transmitter in 1 plus 1 configuration |
All India Radio |
Engineering |
SPECS-100 W FM TX/9/4/2014-D TD/FM |
|
Pump operation and plumbing works Electric works at Staff quarters Holiday home and Office and any other works assigned by the authorities at HPT AIR Bambolom Goa. |
All India Radio |
Engineering |
HPT BAM/1(2)/2019/MW/E |
|
Transportation of 30 KVA Diesel Generator and Ancillary equipments from All India Radio Guna,M.P. to All India Radio, Rewa,M.P. |
All India Radio |
Engineering |
ENGP-5 KW FM TR Rewa/11 TR/Transportation/2018-19 |
|
Work of Technical Helper with Assistant at SW TR in general cleaning of transmitters and all associated equipments. |
All India Radio |
Engineering |
No: HPT BAM/1(2)/2019/MW/E |
|
Acoustic treatment painting polishing and other work in studios of AIR Godhra. |
All India Radio |
Engineering |
ENGP-Digitalization of Studio Godhra/18-19 |
|
Acoustic treatment painting, polishing and other work, in studios of AIR, Surat. |
All India Radio |
Engineering |
ENGP-Digitalization of Studio Surat/18-19 |
|
Acoustic Treatment work at Drama and Music studios of AIR, Studio Site REWA. |
All India Radio |
Engineering |
ENGP- Refurbishing of Studio Rewa/11TR/Acoustic Rewa/18-19 |
|
ACOSTIC WORK, B TYPE TREATMENT FALSE CEILING ETC. AT DIGITISATION OF BALAGHAT |
All India Radio |
Engineering |
ENGP-Digitalization of Studio-Balaghat/11ST/18-19 |
|
Servicing of 350 KVA Diesel Generator Set Make Cummins with materials. 2. Servicing of 350 KVA Diesel Generator Set Make Cummins without materials. |
All India Radio |
Engineering |
GKP 8(2)/2018-19/E/3323 to 3330 |
|
Extension of due date E-Tender enquiry for Repairs/ Renovation works of 100 M Self Supporting Tower at AIR, Karimnagar |
All India Radio |
Engineering |
ADG E SZ /PUR/31/SRMST/2018-19 |
|
Corrigendum to NIT-6/2018-19 |
Doordarshan |
Engineering |
Corrigendum to NIT |
|
CORRIGENDUM-Partial Renovation of Internal Electrical Wiring i/c P and F LED fittings in DDG-E Room and Announcers Rest Room and AC plug point in Room No.62, 63 and Archives and separate power supply |
All India Radio |
Engineering |
18/AE(E)/Kol/2018-19/635 |
|
Supply and Fixing of new RFS make EIA connector and coupling element, Fabrication, Erection Testing and Commissioning of Horizontal Cable Tray. Copper plate earthing for 10 KW AIR FM Transmitte |
All India Radio |
Engineering |
P/1/E-Tender/RF cable tray connector and Earthing/ Muzaffarpur/18-19 |
|
|
|
|
|
|
RMO E and M services at National Media Centre, Raisina Road, New Delhi. SH- Non Comprehensive general maintenance of 4 nos. DG Sets. |
All India Radio |
Engineering |
30/EE E-P/NIT/2018-19 |
|
1.Comprehensive annual maintenance for VRF air conditioning. 2.Maintenance of electrical installation, operation of pump sets and DG sets at SRFTI, Kolkata. SH - Supply of electrical materials. |
All India Radio |
Engineering |
Kol-E/2017-2018/3 4/1182 |
|